Skyline Tower — Dubai, UAE

A 210-metre Grade-A office tower wrapped entirely in factory-assembled unitized panels — delivered 11 months from drawing approval to last panel shipment.

Skyline Tower curtain wall
Year
2025
Façade Area
48,000 m²
Height
210 m
Location
Dubai, UAE
System
MF-U200 Unitized
Scope
Design Assist + Supply
Testing
ASTM E283 / E330 / E331
Delivery
11 months, on schedule
Challenges
  • Parallelogram-shaped vision panels on the south elevation — 4,200 units with 14 unique geometry families
  • Summer site temperatures up to 48°C limiting silicone curing and installation windows
  • Client required LEED documentation for embodied data and packaging waste
  • Fixed handover date tied to the anchor tenant's fit-out contract — no schedule float
Our Approach
  • Parametric unit typology in Grasshopper — 14 families rationalized to 6 through geometry optimization
  • Full thermal simulation package submitted before mock-up; ASTM E283/E330/E331 tested at 1:1 in our lab
  • Unitized lines scheduled around humidity — hot-melt edge-seal lines for the hottest months
  • Weekly photo + video progress reports and a live production dashboard for the client's PMO
Installation on site
Scope of Work

What we supplied

Unitized curtain wall MF-U20041,200 m² — vision + spandrel units, factory-assembled with gaskets
Ground-floor point-supported entrance3,600 m² — 15 mm laminated glass on stainless spider fittings
Roof parapet & crown cladding3,200 m² — powder-coated aluminum press panels
Design assistStructural + thermal calculation package, mock-up, LEED documentation
Scope excludedSite installation (by local façade contractor under main contractor)
Production line
Results
  • 0 defective units on arrival — 100% passed pre-shipment QC inspection
  • Mock-up passed ASTM air/water/structural tests first attempt
  • 42 containers shipped over 9 months with zero customs documentation issues
  • Handover achieved on the contract date; anchor tenant fit-out started on time
Discuss a similar project
Project Gallery

On site

Courtyard and entrance Glass gallery at dusk
More Projects

Related deliveries

Jakarta, Indonesia

Aurora Int'l Airport T2

26,000 m² stick + point-supported glazing.

Case study →
Riyadh, KSA

Central Exchange Tower

62,000 m² unitized curtain wall.

Case study →
Kuala Lumpur, Malaysia

The Fortune Grand

18,000 m² façade incl. BIPV elevation.

Case study →

Send us your drawings today.

Indicative budget and lead time within 48 hours — no obligation.

Request a Quote