Demo prototype — content is placeholder, photos are stock from Unsplash (see CREDITS.md), forms are not live.
Reference Projects

Systems proven on site

Every project below was delivered with systems fabricated in our factory. Scope is stated honestly — where we supplied only, we say so; where we did design assist, we say that too.

Featured Case Studies

Recent deliveries

Office tower project
Dubai, UAE

Skyline Tower

48,000 m² unitized curtain wall · 210 m office tower · design assist + supply.

Case study →
Airport terminal glass facade
Jakarta, Indonesia

Aurora Int'l Airport T2

26,000 m² stick + point-supported glazing across two terminal piers.

Case study →
Hotel tower facade
Kuala Lumpur, Malaysia

The Fortune Grand

18,000 m² façade incl. BIPV south elevation · LEED Gold target.

Case study →
Selected Works

Recent facades, delivered

A selection from hundreds of delivered projects — showrooms, offices, galleries and campuses across 800+ cities and regions.

Commercial showroom facade
Commercial Showroom
Glass hall by the water
Glass Hall by the Water
Sales gallery facade
Sales Gallery
Curved facade at dusk
Curved Facade
Cultural pavilion
Cultural Pavilion
Office campus at dusk
Office Campus
Garden gallery
Garden Gallery
Lakeside gallery
Lakeside Gallery
Showroom villa
Showroom Villa
Glass gallery
Glass Gallery
Courtyard pavilion
Courtyard Pavilion
Curved glass facade
Curved Glass Tower
Full Project List

All deliveries

Filter by region, building type or system in the production build. Every row links to a case study page.

ProjectLocationSystemFaçade AreaYear
Skyline TowerDubai, UAEMF-U200 Unitized48,000 m²2025
Aurora Int'l Airport T2Jakarta, IndonesiaMF-S / MF-P26,000 m²2024
The Fortune GrandKuala Lumpur, MalaysiaMF-U + MF-E BIPV18,000 m²2024
Harbour View OfficesSingaporeMF-S210 Stick15,500 m²2023
Central Exchange TowerRiyadh, KSAMF-U250 Unitized62,000 m²2023
Lakeside Residences Ph.2Hanoi, VietnamMF-W Windows + MF-S21,000 m²2022
Fortune Convention CentreBangkok, ThailandMF-P Point-Supported9,800 m²2022
Northgate Retail PlazaManila, PhilippinesMF-U + MF-D12,400 m²2021
Crown Business Park ADoha, QatarMF-U200 Unitized34,000 m²2021
Silicon Gate CampusHo Chi Minh City, VietnamMF-S / MF-W27,000 m²2020

Demo note: in the production build this table is filterable (region / type / system / area) exactly like the Enclos benchmark.

Could your project be next?

Send drawings today — indicative budget and lead time within 48 hours.

Request a Quote