Demo prototype — content is placeholder, photos are stock from Unsplash (see CREDITS.md), forms are not live.
Home / Products / MF-U200 Unitized
MF-U Series · Flagship

MF-U200 Unitized Curtain Wall System

Factory-assembled panel units for high-rise and geometrically complex façades. Arrives on site as a finished weather-tight unit — fastest installation, fewest site variables, every seal made under controlled factory conditions.

Request a Quote Download Spec Sheet (demo) Request Sample Unit
MF-U200 unitized curtain wall on a tower
Technical Data

Specifications

SeriesMF-U200 (also MF-U180 / MF-U250 depth variants)
Mullion depth180 / 200 / 250 mm
Panel dimensionsTypical 1,200–1,500 mm wide × 3,500–4,500 mm tall (project-specific)
Glass build-upDouble or triple IGU; laminated options; low-e, tempered, heat-soak tested
Max design wind load±3.5 kPa (higher on request with reinforcement)
Thermal performanceU-value from 1.4 W/m²K (with thermal-break profiles and low-e IGU)
Acoustic performanceUp to 42 dB reduction (with laminated acoustic interlayer)
FinishesPA powder coat, PVDF, anodized; wood-grain and custom RAL colors
InstallationHook-and-slide; bracket system pre-fitted; compatible with robotic installation rigs
Performance

Tested to both EN and ASTM standards

Numbers are specified and tested in the standard your project uses — not converted or "equivalent". Reports from our in-house lab or third parties on request.

Air permeabilityEN 12152 Class 4 · ASTM E283 @ 6.27 psf: ≤ 0.06 cfm/ft²
Water tightness (static)EN 12154 Class 5A (600 Pa) · ASTM E331: no leakage @ 8% of design pressure
Water tightness (dynamic)EN 12154 Class 5A · AAMA 501.1 available on request
Wind load resistanceEN 12179 tested to ±3.5 kPa · ASTM E330 to 150% design pressure
Seismic / inter-story drift±25 mm lateral movement tested (project-specific rigs available)
Why MF-U200

Designed for the way it's actually built

  • Weather-sealed in the factory — every gasket joint made under controlled conditions, not on a windy floor
  • Fast floor cycles — hook-and-slide bracket system; 20-30 units per crane-hour typical
  • QR traceability — every unit traced from profile batch to QC sign-off to container position
  • Schedule-friendly — units ship floor-by-floor in install order, steel A-frame packed
Packed units in warehouse
Downloads

Documentation

Proof

Built with MF-U200

Dubai, UAE

Skyline Tower

48,000 m² unitized curtain wall.

Case study →
Riyadh, KSA

Central Exchange Tower

62,000 m² unitized curtain wall.

Case study →
Doha, Qatar

Crown Business Park A

34,000 m² unitized curtain wall.

Case study →

Send drawings — get an MF-U200 budget within 48 hours.

Include panel dimensions and glass spec for the tightest number.

Request a Quote