Factory-assembled panel units for high-rise and geometrically complex façades. Arrives on site as a finished weather-tight unit — fastest installation, fewest site variables, every seal made under controlled factory conditions.
| Series | MF-U200 (also MF-U180 / MF-U250 depth variants) |
|---|---|
| Mullion depth | 180 / 200 / 250 mm |
| Panel dimensions | Typical 1,200–1,500 mm wide × 3,500–4,500 mm tall (project-specific) |
| Glass build-up | Double or triple IGU; laminated options; low-e, tempered, heat-soak tested |
| Max design wind load | ±3.5 kPa (higher on request with reinforcement) |
| Thermal performance | U-value from 1.4 W/m²K (with thermal-break profiles and low-e IGU) |
| Acoustic performance | Up to 42 dB reduction (with laminated acoustic interlayer) |
| Finishes | PA powder coat, PVDF, anodized; wood-grain and custom RAL colors |
| Installation | Hook-and-slide; bracket system pre-fitted; compatible with robotic installation rigs |
Numbers are specified and tested in the standard your project uses — not converted or "equivalent". Reports from our in-house lab or third parties on request.
| Air permeability | EN 12152 Class 4 · ASTM E283 @ 6.27 psf: ≤ 0.06 cfm/ft² |
|---|---|
| Water tightness (static) | EN 12154 Class 5A (600 Pa) · ASTM E331: no leakage @ 8% of design pressure |
| Water tightness (dynamic) | EN 12154 Class 5A · AAMA 501.1 available on request |
| Wind load resistance | EN 12179 tested to ±3.5 kPa · ASTM E330 to 150% design pressure |
| Seismic / inter-story drift | ±25 mm lateral movement tested (project-specific rigs available) |



Include panel dimensions and glass spec for the tightest number.
Request a Quote