Demo prototype — content is placeholder, photos are stock from Unsplash (see CREDITS.md), forms are not live.
20+
Years of expertise
800+
Cities & regions served
1,000+
Service outlets
20,000+ m²
Factory building area
One Partner, Drawing to Delivery

From your drawings to panels on site

You send sketches or tender documents. We take it from there — one team, one factory, one standard.

01

Design Assist

Feasibility review, thermal & structural calculation and value engineering from your concept drawings — within 5 working days.

02

Manufacturing

Intelligent production lines in our 20,000+ m² factory — CNC machining, robot-assisted assembly and full-process quality control under one roof.

03

Testing

Performance verified before mass production — safety, sound and thermal insulation, energy saving and wind-pressure resistance, with reports included.

04

Service Network

1,000+ service outlets across 800+ cities and regions — local support from measurement to aftercare, wherever your project is.

Products

Facade systems for every building type

Unitized curtain wall panels
MF-U Series

Unitized Curtain Wall

Factory-assembled units for high-rise and complex geometry. Fastest installation on site.

System details →
Point supported glass facade
MF-P Series

Point-Supported Glazing

Spider-fitting structural glass for atriums, canopies and crystal-clear entrance volumes.

System details →
BIPV solar facade
MF-E Series

BIPV Solar Façade

Photovoltaic and solar-control glass integrated into vision and spandrel panels — the envelope generates power while keeping the design intent.

System details →

See all 6 systems

Reference Projects

Recent deliveries

Skyline Tower office building
Dubai, UAE

Skyline Tower

48,000 m² unitized curtain wall · 210 m office tower · delivered in 11 months.

Case study →
Airport terminal glass facade
Jakarta, Indonesia

Aurora Int'l Airport T2

26,000 m² stick + point-supported glazing across two terminal piers.

Case study →
Hotel tower facade at golden hour
Kuala Lumpur, Malaysia

The Fortune Grand

18,000 m² façade incl. BIPV south elevation · LEED Gold target.

Case study →

All reference projects

Who We Work With

Built around your role in the project

For Developers & Architects

Design intent, protected

Early-stage budgeting, system selection and performance targets — so the façade you designed is the façade that gets built.

  • Free indicative budget in 48h
  • System samples & mock-ups
  • Performance spec to EN / ASTM
For Façade Contractors

Reliable factory capacity

Supplement your own capacity or subcontract complete unit production — your brand, our factory.

  • OEM with your drawings & labels
  • 35,000 m²/month output
  • Fixed-price, fixed-schedule quotes
For Main Contractors

De-risked procurement

One accountable supplier for design assist, fabrication, testing and shipping — with documentation your client expects.

  • Full QA/QC documentation pack
  • Milestone-based payment terms
  • Photo & video progress reporting
Insights

Practical guides for façade procurement

Buyer's Guide

How to Evaluate a Curtain Wall Supplier from China

A 7-point checklist covering factory audits, EN/ASTM test reports, packing standards and payment terms.

Read article →
Technical

Unitized vs. Stick-Built: Cost, Speed & When to Use Which

The trade-offs that actually move your budget — with a comparison table you can put in your tender.

All articles →
Standards

GB vs. EN vs. ASTM: What Façade Ratings Actually Mean

Why a “Class 4” result in China doesn't equal Class 4 in Europe — and how to specify correctly.

All articles →

Send us your drawings today.

Indicative budget and lead time within 48 hours — no obligation.

Request a Quote